Change Management Matrix 5.2
The deadline for submitting (V0.84/0.85) was June 30, 2026.
You can still submit reports; they will be considered at a later date.
- Opening the audit tool: https://audit.econgood.org/und Log in ➡ Request ➡ Click on “Change management entries for version Matrix 5.2 V0.8) Direct link: Change notification
- Please check the table to see if the suggestion has already been submitted. This can happen especially if it concerns objective errors such as incorrect formulas, spelling mistakes, or similar.
If not, please click on the link “Create new change notification” (top left above the table). - Please fill out the form:
– Fields marked with * are mandatory.
– The more precisely the suggested improvement can be classified, the easier and faster the MDT can process the issue.
– Some fields contain a drop-down list for easy completion.
– Then there are text fields where the issue can be described in detail. Please make sure to describe the problem in detail, what can/should/must/may be improved, and please also include a suggestion for improvement. - Press the “Send” button at the bottom left. The MDT will receive the feedback and process it. You will be notified by email when the change has been implemented, or we will contact you if we have any questions.
The last 10 entries
Status des Eintrags: 304118, CH-M5.2-153, JiraID:
| Who (author of the change request) | gebhard.moser@econgood.org |
|---|---|
| When (date of the change request) | 2. June 2026 |
| What change would you like to propose? | Konkrete Berichtsfrage |
| Section | M5.2 Full Balance: B3.3 |
| Selected Topic | B3.3 |
| Look up matrix dyn(ID) | 261758 |
| Matrix version | M5.2V |
| Matrix Field | B3.3 |
| Reporting Question ID | B3.3.Q05 |
| Question text | Welche Ergebnisse wurden bisher im Umgang mit kritischen Ressourcen erzielt? (Falls möglich, bewerten Sie die Wirksamkeit der ergriffenen Maßnahmen.),What results have been reached so far regarding critical resources? (If possible, evaluate the effectiveness of the actions taken.) |
| What change is required (brief description) | Was ist hier mit Ergebnissen gemeint? Welchen Gewinn oder Umsatz oder Produktionsmenge das Unternehmen daraus erzielt hat, oder geht es um die Reduktion kritischer Ressourcen? |
| What specific change is proposed (detailed description) | Welche Reduktion der Verbrauchsmengen von kritischen Ressourcen wurden bisher erzielt? |
| Change ID | CH-M5.2-153 |
| Entry | neu |
Tabulator Bearbeitung ermöglichen.
Liste -display-frm-data id=”100588″-
11.07.2026, 21:57